Position the top frame
Top Dura-Trac™ Frame lip should be flush against the bottom with the “c” shape open hanging off the fascia edge, the opening should be facing down.
The Dura-Trac™ frame: banners slide into the channel; self-tapping screws go along the flat portion.
Top Dura-Trac™ Frame lip should be flush against the bottom with the “c” shape open hanging off the fascia edge, the opening should be facing down.
Bottom Dura-Trac™ Frame lip should be flush against the top of the dugout with the “c” shape open off the fascia edge, the opening should be facing up.
Attach the Dura-Trac™ Frame to the surface using 3 self tapping screws per each 8’ section.
Once both the top and the bottom frame are installed, the next step is to slide the banner into the unit. You will want to slide both the top and bottom Dura-Trac™ rails at the same time, to make sure that both rails fit correctly in the frame openings.
Side view of installed frame.
Banner with the Dura-Trac™ System in it.
Finished look.
Questions about your install? Call 800.790.7611.
Get A FREE Mock-Up & Quote